Collins, A, Blondel, A A, Mensah, S and Manu, E (2021) Assessing the cost of competitive tendering in Ghana using transaction cost theory. Built Environment Project and Asset Management, 11(5), 835-50.

Hemalattha, S and Vidjeapriya, R (2021) Developing an integrated framework for optimization of spatial requirements of construction equipment. Built Environment Project and Asset Management, 11(5), 903-17.

Julayhe, N and Rahman, M M (2021) Dwellers' perception on challenges and motivators of greening existing buildings in Brunei Darussalam. Built Environment Project and Asset Management, 11(5), 870-87.

Ofori, G, Zhang, Z and Ling, F Y Y (2021) Initiatives that enable Singapore contractors to improve construction productivity. Built Environment Project and Asset Management, 11(5), 785-803.

Olatunde, N A and Odeyinka, H A (2021) Extent of stakeholder management practices in building projects procured by private corporate organisations in Nigeria. Built Environment Project and Asset Management, 11(5), 819-34.

  • Type: Journal Article
  • Keywords: organisations; stakeholder management; social responsibility; strategic management; variance analysis; developing countries; industrialized nations; Ireland; Nigeria
  • ISBN/ISSN:
  • URL: http://dx.doi.org/10.1108/BEPAM-05-2020-0102
  • Abstract:
    Studies on stakeholder management (SM) in developing countries have largely focused on public projects. However, projects of private organisations also need much improvement. The purpose of the study was to examine the extent of SM practices in building projects procured by private corporate organisations. Purposive sampling technique was used to select project managers (PMs) and client representatives (CRs) who have been involved in projects procured by private corporate organisations between 2008 and 2017 in Southwestern Nigeria. The PMs are comprised of executive and non-executive PMs as well as contract administrators. Both the PMs and CRs were requested to provide information on one building project in which they were involved within the period under consideration. The data collected were analysed using mean score (MS) analysis, t-test, and analysis of variance. The results showed that structured SM processes were followed in only 30.65% of building projects procured by private corporate organisations in the study area. Results further showed on a five-point scale 5-max scale that SM practice was highest with an MS of 3.92 on projects where executive PMs were appointed and lowest (MS = 2.85) on projects where PMs were appointed as contract administrators. Furthermore, it was found that respondents placed the highest premium (MS = 3.73) on stakeholder identification while they placed the lowest premium (MS = 3.45) on developing implementation strategies and stakeholder classification. The study examines the status quo regarding SM practice in the study area in order to devise a means of refinement. The study is an attempt to evaluate the premium placed on different components of SM practices by differing categories of project managers.

Oluwole, A O, Jane Jia Suen, L, Heap-Yih, C and Akanmu, A A (2021) Building information modelling penetration in quantity surveying practice. Built Environment Project and Asset Management, 11(5), 888-902.

Sambo Lyson, Z, Mwansa, C and Zulu, E (2021) Perceptions and beliefs influencing intention to use solar energy solutions in Zambian households. Built Environment Project and Asset Management, 11(5), 918-33.

Tuan Son, N, Sherif, M and Mostafa, S (2021) Project stakeholder's engagement and performance: a comparison between complex and non-complex projects using SEM. Built Environment Project and Asset Management, 11(5), 804-18.

Wanigarathna, N, Sherratt, F, Price, A D F and Austin, S (2021) Sources and flow of healthcare built environment design evidence. Built Environment Project and Asset Management, 11(5), 851-69.